11-675-370

Unity Lab Services™ Thermo Scientific™ Water Purification Validation Documention for Thermo Scientific™ Barnstead LabTower II

Manufacturer: Unity Lab Services™

Select a Size

Pack Size SKU Availability Price
Each of 1 11-675-370-Each-of-1 In Stock ₹ 93,174.84

11-675-370 - Each of 1

₹ 93,174.84

In Stock

Quantity

1

Base Price: ₹ 93,174.84

GST (18%): ₹ 16,771.471

Total Price: ₹ 1,09,946.311

For Use With (Equipment)

Thermo Scientific Water Purification including Thermo Scientific Barnstead LabTower II

Description

Documentation Only for the following, Services Not Included: Validation (IQ/OQ) includes a standardized protocol procedure, IQ: Verify Installation and environmental conditions, OQ: Verify operation to design specification, Flow Adjustment, Water Pressure, Resistivity, Power Failure testing.

Location

Contact your local sales representative for a list of standard and extended coverage areas.

Includes

IQ/OQ Documentation

Related Products

Img

Unity Lab Services™

11-675-380

--

Img

Unity Lab Services™

11-675-227

--

Img

Unity Lab Services™

11-675-376

--

Img

Unity Lab Services™

11-675-257

--

Img

Unity Lab Services™

IOQPE33917

--

Img

Unity Lab Services™

10-549-242

--

Img

Unity Lab Services™

IOQPE33913

--

Img

Unity Lab Services™

IOQDE03486

--

Description

  • IQ/OQ documentation that supports regulatory requirements and industry standards for instrument compliance
  • Our documents are kept up to date by conducting annual reviews
  • We work directly with our product experts to have the most updated documentation available.

Compare Similar Items

Show Difference

Img

Unity Lab Services™

11-675-370

--


For Use With (Equipment):
Thermo Scientific Water Purification including Thermo Scientific Barnstead LabTower II

Description:
Documentation Only for the following, Services Not Included: Validation (IQ/OQ) includes a standardized protocol procedure, IQ: Verify Installation and environmental conditions, OQ: Verify operation to design specification, Flow Adjustment, Water Pressure, Resistivity, Power Failure testing.

Location:
Contact your local sales representative for a list of standard and extended coverage areas.

Includes:
IQ/OQ Documentation

Img

Unity Lab Services™

11-675-375

--


For Use With (Equipment):
Thermo Scientific Water Purification including Thermo Scientific Barnstead Pacific TII

Description:
Validation (IQ/OQ) includes a standardized protocol procedure, IQ: Verify Installation and environmental conditions, OQ: Verify operation to design specification, Flow Adjustment, Water Pressure, Resistivity, Power Failure testing.

Location:
Contact your local sales representative for a list of standard and extended coverage areas.

Includes:
Travel to major metropolitan areas. Does not include Installation. Instrument must be installed, powered-up and set temperature point for 24 hours before on-site service

Img

Unity Lab Services™

11-675-376

--


For Use With (Equipment):
Thermo Scientific Water Purification including Thermo Scientific Barnstead LabTower EDI

Description:
Validation (IQ/OQ) includes a standardized protocol procedure, IQ: Verify Installation and environmental conditions, OQ: Verify operation to design specification, Flow Adjustment, Water Pressure, Resistivity, Power Failure testing.

Location:
Contact your local sales representative for a list of standard and extended coverage areas.

Includes:
Travel to major metropolitan areas. Does not include Installation. Instrument must be installed, powered-up and set temperature point for 24 hours before on-site service

Img

Unity Lab Services™

11-675-380

--


For Use With (Equipment):
Thermo Scientific Water Purification including Thermo Scientific Barnstead LabTower II

Description:
Validation (IQ/OQ) includes a standardized protocol procedure, IQ: Verify Installation and environmental conditions, OQ: Verify operation to design specification, Flow Adjustment, Water Pressure, Resistivity, Power Failure testing.

Location:
Contact your local sales representative for a list of standard and extended coverage areas.

Includes:
Travel to major metropolitan areas. Does not include Installation. Instrument must be installed, powered-up and set temperature point for 24 hours before on-site service